You are here

Assar
Architects

News

01.2016
The call for projects for the Bruocsella price is launched, Assar is part of the collective.
 
Deadline for submission of applications: 21 February 2016
 
NEW ERASME
01.2016

Planning permission for the “New Erasme” was filed in November. This is a dual programme. On the one hand, creating nearly 90,000 m² of new infrastructures and, on the other hand, refurbishing part of the existing wings.

Domaine des Vallées
01.2016

The “Domaine des Vallées” was inaugurated on 28 October.

Aile 1000
01.2016

Located at the heart of Brabant Wallon, the Saint Pierre hospital is constantly evolving, which recently entailed an expansion consisting of new wings to accommodate the emergency, endoscopy and gynaecology departments.

Ensor & Delvaux
01.2016

In mid-October 2015, the second phase of the Ensor & Delvaux project, located in Woluwe-Saint-Lambert, began its provisional acceptance processes.

01.2016

A la mi-octobre 2015, la seconde phase du projet nommé Ensor & Delvaux situé à Woluwe-Saint-Lambert a débuté ses réceptions provisoires.

HIS IZZ
01.2016

Enclosed within a block, surrounded by a large number of individual houses and residential buildings, Ixelles hospital has evolved despite this constraint.

LAVOISIER RESIDENTIAL
LAVOISIER RESIDENTIAL
01.2016

Located in Molenbeek, this 1930s industrial building has been converted into a multifunctional building consisting of productivity areas and a living space.

W34
W34
01.2016

Located along the Boulevard de la Woluwe in Brussels, W34 was delivered for acceptance in May. This project is a conversion of an office building built in the ’70s on 8 floors, into a residential building of 7137 m² surface area. Only the building structure has been preserved.

Veridis
Veridis
01.2016

The head office of the international insurance brokerage company Marsh & McLennan in Brussels, the Veridis building was inaugurated in March 2015.

Pages

Clearfix