Two major challenges guided the design of this project for a new residential nursing and care home providing accommodation for 130 residents:
- Firstly: To design a building meeting zero energy standards, which was a first in 2009.
Two major challenges guided the design of this project for a new residential nursing and care home providing accommodation for 130 residents:
- Firstly: To design a building meeting zero energy standards, which was a first in 2009.
On the next 3rd and 4th of April the professional show of healthcare will take place in Namur Expo. This exhibition will gather up the equipment, the solution and the innovation in the sector of the healthcare. The main goal is also to make the professional meeting easier.
This housing project, which began in 2005 with the construction of 5 houses, is continuing in successive phases. A block of 33 apartments on the Boulevard du Souverain in Auderghem has just been completed, forming a whole with 4 other apartment blocks and 21 individual houses rooted within the Promenade Verte.
Work has just been completed on this new research centre for the analysis and development of AGC glass products, located in the Aeropole science park in Charleroi.
Following the recent opening of the new “Health Suite” wing at the Namur Regional Hospital, ASSAR ARCHITECTS organised an information evening on 14 November 2013, at which a number of revolutions in hospital care were presented.
With the completion of the new “Health Suite” wing, ASSAR ARCHITECTS has reached the end of a significant new phase in the renovation of Namur hospital.
The new hospital construction project in pictures: its origins and its future.
Work began in July 2013.
After demolition of the existing building, remains of the Brussels city wall dating from the 13th century were exposed. The new structure, an office building with a “zero energy” target and excellent BREEAM rating, will take into account the existence of the historic monument.
Completion of the work is scheduled for June 2015.